ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

a construction company can remove 2/3 tons of dirt from construction site each hour how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Goldenpineapple123
Goldenpineapple123 Goldenpineapple123
  • 22-06-2018
You would want to divide 30 by 2/3 so you would do 30/1 times 3/2. This method is known as keep change flip or kcf (Kentucky Chicken Fried is what some people say) your final answer should come out to 90/2 which simplified is 45. Hope this helped
Answer Link

Otras preguntas

I NEED HELP WITH MATH STATISTICS
how do you think the men knew the position of the island ? -treasure island
TRUE/FALSE. the number of degrees of freedom in cross-tabulation data with three rows and four columns is 12.
How did nativism and the red scare lead to immigration restriction?
O+O+O=30 1-3 -5 -7 9 -11 - 15
Forever Living deals with:
how would you describe the land in the grassland ecosystem? how do you think this contour affects the ecosystem?
a shade of paint purple berry can be made by mixing red and blue paint in the ratio 5:2. Emma has 30 litres of red paint and 10 litres of blue paint.work out th
Terminal 2 on a Potential Relay goes to _______ ?
Please help quickly!!!!