which of the following statement is correct? a. Process group is the same as project phases, b. each process group has a mapped project phase, c. process group are not project phases, d. the monitoring and control process group applies only in the monitoring and control phase

Respuesta :

lavishlyspoiled
lavishlyspoiled lavishlyspoiled
  • 23-09-2020

Answer:

The answer is C

Project groups are NOT project phases.

Answer Link

Otras preguntas

How is copper disposed of after use ?
50% of cakes baked are party cakes - 1/5 were fruit cakes and remainder were sponge cakes. What percentage of cakes were sponge cakes?
ten boys share 7 cereal bars equally. what fraction of a cereal bar does each boy get?
can 3/5 be simplified
how does moon shadow fit into the demon culture
Explain how to find the absolute value of an interger
Cuban tree frogs eat smaller native frogs in the Florida Everglades. What does this scenario represent?
How many solutions does the equation 3x+x+3=2(2x+1)+1 have?
What were the two major points of Darwin's publication "The Origin of Species"?
Use the position equation given below, where s represents the height of the object (in feet), v0 represents the initial velocity of the object (in feet per seco