truongtbngoc2909 truongtbngoc2909
  • 22-05-2021
  • Mathematics
contestada

If 3 men can paint 4 houses in 5 days , how many days does it take for 7 men paint 14 houses ??? help me plz

Respuesta :

bestbabe
bestbabe bestbabe
  • 22-05-2021

Answer:

3men = 4houses= 5days

7men= 14houses= x days

14÷7 = 2days

Answer Link

Otras preguntas

what is the 23rd term from these sequences   5,6,7,8,9
One of the largest lotto wins was 22,590829 . Round this amount to the nearest 100,000 ?
use reference angles to find the exact value of tan 405 deg
what caused the dust bowl
i need help writing an equation from a graph
A baseball player reaches base 35% of the time. How many times can he expect to reach base in 850 at-base?
What is the ranges for f(x) = 2x + 4 when the domains are 1, 2, 3, and 10
A number (x) increased by 6 and then the sum is doubled
use reference angles to find the exact value of tan 405 deg
A number (x) increased by 6 and then the sum is doubled